Project
FIU Bridge Canopy
Engineering and detailing support for canopy steel with complex interfaces and field coordination requirements.
Overview
The canopy scope demanded careful detailing around geometry, connections, and installation constraints.
Deliverables
- Shop drawings
- Erection coordination
- Connection details
- Field interface review
Key highlights
- Specialty geometry
- Close field coordination
- Constructability-driven detailing
Services involved
Start the conversation
Need this level of steel coordination?
Send the scope, drawings, or bid package. JC Structural Engineering will help define the right path forward.